Interim Total Trash Capture Device (TTCD) Installation in Estudillo Canal to Comply with RWQCB MRP Section 10

3 Documents in Project

Summary

SCH Number
2018122038
Lead Agency
Alameda County
Document Title
Interim Total Trash Capture Device (TTCD) Installation in Estudillo Canal to Comply with RWQCB MRP Section 10
Document Type
NOD - Notice of Determination
Received
Posted
2/8/2019
Present Land Use
Single - multifamily residential and open space
Document Description
The Alameda County Public Works Agency is implementing SF Bay RWQCB certified full capture systems of trash treatment control devices (TTCD) properly sized to trap particles 5mm and greater and trash debris in channel flows in the region specific 1-year, 1-hour design storm, without adverse hydraulic effects upstream. The TTCD will be Estudillo Canal between Washington Avenue and I-880 Freeway Northbound on/off ramp on Caltrans property. The TTCD will be installed on the bottom of the existing concrete lined rectangular channel. A 48' high concrete weir to direct trash debris laden low flows into the six linear trash treatment control devices will be constructed. The existing openings in the concrete flow restrictor walls downstream of the devices location will be enlarged to increase flow discharge to compensate for the potential hydraulic effects of the TTCD in the channel.

Contact Information

Name
Jim Browne
Agency Name
Alameda County
Contact Types
Lead/Public Agency

Location

Cities
San Leandro
Counties
Alameda
Cross Streets
Washington Ave at I-880 Freeway
Zip
94577
Total Acres
6500 sq ft
State Highways
I-580, I-880
Railways
UPRR; BART
Airports
Oakland International
Waterways
Estudillo Canal

Notice of Determination

Approving Agency
Alameda County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No