Lodi High School - Measure U Campus School Repair and Improvements Project

2 Documents in Project

Summary

SCH Number
2018122030
Lead Agency
Lodi Unified School District
Document Title
Lodi High School - Measure U Campus School Repair and Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2019
Present Land Use
public/quasi-public
Document Description
The Lodi Unified School District is proposing school repair and improvements to the northern and eastern portions of the Lodi High School with funding provided by Measure U. The proposed improvements include the demolition/relocation of existing Maintenance and Operations buildings off campus, the removal of approx 35 existing modular classrooms, and new construction of one and two-story classroom buildings in the northeastern portion of the site which will include a min of 52 classrooms and 6 science labs. A new one-story addition to the existing Administration Building will be constructed easterly from the existing structure. Associated improvements will consist of construction of two new asphalt concrete parking lots; one staff parking lot is planned for the northwest portion of the site, which replaces the parking currently on the northeast portion where the new buildings are planned, and one additional student parking lot south of the Administration Building. The proposed school repair and improvements are intended to service the current student body and faculty attending Lodi High School. The proposed project will not serve to facilitate any anticipated growth in enrollment and/or employment.

Contact Information

Name
Leonard Kahn
Agency Name
Lodi Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Lodi
Counties
San Joaquin
Cross Streets
Elm St and Lodi Ave
Zip
95242
Total Acres
44.52
Parcel #
035-110-12
State Highways
Hwy 99
Railways
Amtrak
Schools
various
Waterways
Mokelumne River
Township
3N
Range
6E
Section
2
Base
1851
Other Location Info
3 South Pacific Avenue

Notice of Determination

Approving Agency
Lodi USD
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print