Development Code Text Change 668.15, CUP No. 16-04, Tentative Parcel Map 16-02 (Lemoore Cooler, LLC)

Summary

SCH Number
2018121027
Lead Agency
Kings County
Document Title
Development Code Text Change 668.15, CUP No. 16-04, Tentative Parcel Map 16-02 (Lemoore Cooler, LLC)
Document Type
MND - Mitigated Negative Declaration
Received

Document Description
The proposed system will receive energy from the existing PG&E utility line and store the energy in battery modules until it is distributed into the existing PG&E Henrietta Substation. Each phase will take approx three months to construct. The initial system (phase 1) will be able to deliver 10 megawatts of power for up to four continuous hours, resulting in a capacity of 40 megawatt-hours of stored energy available for grid services and system reliability. The system constructed in phase 1 will consist of forty shipping containers containing six energy storage sub models with AC/DC inverters each. Underground low voltage cables will be run to a low profile, pad-mounted switchgear and then to a pad-mounted step-up transformer. The transformer will be located at the northwest corner of the parcel, where underground 12 kV cables would be routed to banks 3 and 5 of PGE's Henrietta 12 kV substation, less than a mile to the north of the proposed project site. As additional storage capacity is needed, phase 2-6 will be constructed with the following infrastructure and storage capabilities: - phase 2: 112 DC Battery Modules, 15 transformers, 18 switchgears for a total storage capacity of 40 megawatts, or 160 megawatt hours. - phase 3 through 6, each: 152 DC Battery Modules, 20 transformers, 24 switchgears, for a total storage capacity of 60 megawatts, or 240 megawatt hours each (technology advancements are being considered, therefore the modules will increase its energy density over the years).

Contact Information
Chuck Kinney
Kings County
1400 W. Lacey Boulevard
Hanford, CA 93230

559-852-2674

Location

Coordinates
36°13'40"N 119°54'16"W
Cities
Lemoore
Counties
Kings
Cross Streets
25th Ave and Avenal Cutoff Road
Zip
93245
Total Acres
20
Parcel #
024-190-069
State Highways
198
Township
19S
Range
19E

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (Battery energy storage system with land division)
Local Action
Subdivision Use Permit
Project Issues
Landuse Growth Inducing Wetland/Riparian Water Supply Water Quality Vegetation Traffic/Circulation Toxic/Hazardous Solid Waste Soil Erosion/Compaction/Grading Septic System Schools/Universities Recreation/Parks Public Services Noise Minerals Geologic/Seismic Flood Plain/Flooding Drainage/Absorption Biological Resources Archaeologic-Historic Air Quality Agricultural Land Aesthetic/Visual
Reviewing Agencies
Air Resources Board, Major Industrial Projects California Department of Parks and Recreation California Energy Commission California Highway Patrol California Public Utilities Commission Caltrans, District 6 Central Valley Flood Protection Board Department of Conservation Department of Fish and Wildlife, Region 4 Native American Heritage Commission Office of Emergency Services, California Office of Historic Preservation Regional Water Quality Control Bd., Region 5 (Fresno) Resources Agency
Download CSV New Search