Water Supply Improvement Project

2 Documents in Project

Summary

SCH Number
2018121024
Lead Agency
Saucelito Elementary School District
Document Title
Water Supply Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/20/2019
Present Land Use
school site/exclusiive ag, 40-acre min/valley ag
Document Description
The project proposes to drill and construct a new production well (Well No. 3) for the school, on the school property. In addition to the construction of Well No. 3, a 100,000-gallon bolted steel water storage tank will be constructed. The storage tank will measure approx 16 ft in height and approx 32 ft in diameter and will be located at the well site. Based on the school's average daily demand, the tank will be able to store approx 1.3 days of potable water. In order to reduce stagnation and turn over water more frequently, the water from the storage tank will be utilized for both irrigation and potable demands. Well No. 1 will be demolished under permit per Tulare county requirements. Once Well No. 3 is operational, existing Well No. 2 will be kept online for backup and emergency purposes.

Contact Information

Name
Cynthia Lamb
Agency Name
Saucelito Elementary School District
Contact Types
Lead/Public Agency

Location

Counties
Tulare
Cross Streets
Avenue 104/Road 176
Zip
93270
Total Acres
0.25
Parcel #
300-200-037
Schools
Saucelito ES
Waterways
Deer Creek
Township
22S
Range
26E
Section
33
Base
MDBM
Other Location Info
Terra Bella
Other Information
17615 Ave 104, Terra Bell, CA 93270

Notice of Determination

Approving Agency
Saucelito School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print