State Route 86/Avenue 50 New Interchange Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018121012
- Lead Agency
- Caltrans, District 8 - San Bernardino/Riverside (California Department of Transportation, District 8)
- Document Title
- State Route 86/Avenue 50 New Interchange Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/22/2019
- Project Applicant
- City Coachella
- Document Description
- The project would convert a portion of SR-86 from an at-grade signalized intersection into a grade-separated full interchange with a new OC bridge and access ramps. The project would also construct a new bridge structure over the CVSC that would replace the existing at grade low water crossing. The construction of the bridge for Ave 50 over the CVSC would also include realignment and widening of a portion of Ave. 50, and realignment of portions of Tyler Street on both the west and east sides of SR-86. The existing 1-lane in each direction road that is located within the limits of the CVSC would become a CVSC maintenance road. The project will be constructed in 2 phases.
- Contact Information
-
Shawn Oriaz
Caltrans District 8
464 W. 4th Street, 6th Floor (MS 827)
San Bernardino, CA 92401-1400
Phone : (909) 388-7034
Location
- Cities
- Coachella
- Counties
- Riverside
- Cross Streets
- Intersection of SR-86 and Ave. 50, City of Coachella, Riverside County
Notice of Determination
- Approving Agency
- Caltrans District 8
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2018121012 PDF 3639 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.