Substantial Conformance Determination for a Minor Modification to the Approved Greens Group/Veterans Plaza-Plot Plan PP16-02, located at 22400 Van Buren Bouleva

Summary

SCH Number
2018118511
Public Agency
March Joint Powers Authority
Document Title
Substantial Conformance Determination for a Minor Modification to the Approved Greens Group/Veterans Plaza-Plot Plan PP16-02, located at 22400 Van Buren Bouleva
Document Type
NOE - Notice of Exemption
Received
Posted
11/29/2018
Document Description
The applicant is proposing the following changes to the April 12, 2017 approved Plot Plan PP 16-02 and CUP 16-01, to reflect the following changes: 1) Change the reorientation of site plan - relocation of buildings A, B, C, D, G, J and L; 2) Change in project phasing; 3) change in building square footages; 4) elimination of one driveway entry along Opportunity Way; and 5) minor modifications to the approved building elevations. According to the March JPA Development code 9.02.280, the March Joint Powers Authority has determined that the proposed changes associated with the previously approved development project are in substantial conformance with plot plan 16-02. The proposed project is a minor alteration to a previously approved design plan with no direct changes to the building footprint. Pursuant to CEQA, the filing of a NOE is required.

Contact Information

Name
Jeffrey M. Smith
Agency Name
March Joint Powers Authority
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Other Location Info
southeast portin of North Campus of Meridian SP Area, northeast corner of Van Buren Blvd and Opportunity Way;

Notice of Exemption

Exempt Status
Other
Type, Section or Code
not a project
Reasons for Exemption
Under State CEQA Guidelines, section 15061. Review for exemption (b) a project is exempt from CEQA if (3), "The activity is covered by the general rule that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA." 1) Change the reorientation of site plan - relocation of buildings A, B, C, D, G, J and L; 2) Change in project phasing; 3) change in building square footages; 4) elimination of one driveway entry along Opportunity Way; and 5) minor modifications to the approved building elevations. The proposed changes do not have the potential for causing any new significant effect to the environment which was not previously analyzed in the IS/Addendum for PP16-02. The planning director finds the proposed changes are not significant alterations to the previously approved PP16-02. Pursuant to CEQA, staff will file a NOE with the Riverside County Clerk's Office.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print