BH Farming Burch Creek Bank Repair West Project, WDID# 5A52CR00173, Corning
Summary
SCH Number
2018118166
Public Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Redding
Document Title
BH Farming Burch Creek Bank Repair West Project, WDID# 5A52CR00173, Corning
Document Type
NOE - Notice of Exemption
Received
Posted
11/8/2018
Document Description
The northernmost bank (proximal to the farm road/walnut orchard) will be stabilized using biotechnical erosion control methods. Bed load and gravel will be relocated from the thalweg and creek bed to the creek's eroding bank. The native riparian vegetation within the streambed will be relocated to the eroding bank. The relocated vegetation will be irrigated to promote root growth and plant reestablishment. The project will run 500 feet in length and an estimated 3,000 cubic yards of accumulated gravel will be relocated to the eroding bank. There will be a discharge of dredge and fill material into 0.09 acre below the ordinary high-water mark and the dredging of 0.12 acre of accumulated sediment that will be used as fill material to restore the uplands.
Contact Information
Name
Matthew Roberts
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Tehama
Parcel #
085-090-016-000
Other Location Info
Location Specific: 2865 Black Butte Road, Corning, Tehama County
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Title 14, Art. 19, Sec. 15304
Reasons for Exemption
This project is Categorically Exempt under CEQA section 15304 because the project involves minor private alterations to Burch Creek to stabilize an eroding bank, that does not involve removal of mature, scenic trees.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.