University Avenue Overcrossing Vertical Clearance Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018112052
- Lead Agency
- Caltrans 4 (Oakland) (California Department of Transportation, District 4)
- Document Title
- University Avenue Overcrossing Vertical Clearance Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/30/2019
- Project Applicant
- Yolanda Rivas (Caltrans)
- Document Description
- Caltrans will replace the existing overcrossing with a new raised structure of about 16 feet 6 inches to meet current Caltrans standards. The new overcrossing will be constructed with two roundabouts. One roundabout will be on an elevated structure at the intersection of University Avenue and the EB 1-80 on and off ramps. The other roundabout will create a new intersection that will be accessed from University Avenue, the WB 1-80 on and off ramps, and the West Frontage road. There will be two lanes in each direction on the overcrossing with new sidewalks that connect to the pedestrian ramp. The on and off ramps for WB 1-80 will be reconfigured to conform to the raised overcrossing.
- Contact Information
-
Yolanda Rivas
CADept of Transportation (Caltrans)
111 Grand Avenue, MS-88
Oakland, CA 94612
Phone : (510) 286-6216
Location
- Cities
- Berkeley
- Counties
- Alameda
- Cross Streets
- Alameda County, Berkeley, at University Avenue and Interstate 80
Notice of Determination
- Approving Agency
- California Department of Transportation (Caltrans)
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 111 Grand Avenue, Oakland CA 94612
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- 2018112052 PDF 3360 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.