Highline Water Pipeline Repair Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018112041
- Lead Agency
- Montecito Water District
- Document Title
- Highline Water Pipeline Repair Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/4/2018
- Present Land Use
- A: Creek/1 Fam Res:3-E-1/Semi-rural Res-0.33; B: Creek/1 Fam Res: 2-E-1/Semi-rural Res-0.5; C: Creek/Mtns Area
- Document Description
- MWD proposes to construct and operate the Highline Water Pipeline Repair Project to provide for permanent infrastructure restoration of the water conveyance system at 3 sites within the Montecito Planning Area, Santa Barbara County, CA. The 3 sites are: Site A (Cold Springs Creek) at APN 013-060-032, Site B (San Ysidro Creek) at APN 007-020-034, and Site C (Romero Canyon Creek). The project will involve the permanent repair of a 14-inch steel potable water transmission main (highline) servicing the community of Montecito and will replace temporary emergency repairs currently in place. The permanent repairs are needed to ensure no disruption in water service for firefighting and domestic water users within the District.
- Contact Information
-
Adam Kanold
Montecito Water District
Lead/Public Agency
583 San Ysidro Road
Montecito, CA 93108
Phone : (805) 969-2271
Location
- Counties
- Santa Barbara
- Cross Streets
- 3 locations
- Parcel #
- 013-060-032, 007-020-034, 155-030-055
- State Highways
- US 101
- Railways
- UPRR
- Schools
- Various
- Other Location Info
- Montecito
Notice of Determination
- Approving Agency
- Montecito Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 583 San Ysidro Road, Montecito, CA 93108
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.