Lewiston Community Services District Water Distribution System Replacement Project

2 Documents in Project

Summary

SCH Number
2018112026
Lead Agency
Lewiston Community Services District
Document Title
Lewiston Community Services District Water Distribution System Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/14/2019
Present Land Use
single family, commercial, PF

Document Description
The existing Lewiston Park water system was installed circa 1957 and consists of both 6-in. and 4-in. asbestos cement pipe. Recent exposure of the asbestos cement pipe indicated the joints may have been sealed with lead and one lead service connection hasbeen found. LCSD presumed there are more. The project will replace approximately 3,025 feet of 6 in., and 5,400 feet of 4 in. asbestos cement pipe with approx. 4,000 feetof 8-in. and 6,275 feet of 6-in. PVC water pipe. The District is replacing its wastewater collection system within the enxt two years and would like to replace its aged and leaking water distribution system at the same time in an effort to keep cost down.

Contact Information
Mel Deardorff
Lewiston Community Services District
P.O. Box 164
Lewiston, CA 96052

Phone : (530) 778-3018

Location

Coordinates
40°41'55.8"N 122°50'26.2"W
Counties
Trinity
Cross Streets
Texas Ave, First St, Second St, Third St, Donner St, Sutter St, Trinity Vista, Fremont St
Zip
96052
Total Acres
31
Parcel #
multiple
State Highways
3
Schools
Lewiston ES
Waterways
Trinity River
Township
33N
Range
8W
Section
19,20
Base
MDBM
Other Location Info
Lewiston

Notice of Determination

Approving Agency
Lewiston Community Services District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Lewiston Community Services District

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes