Highway 1/ Terrace Avenue Signalization and Eastside Multi-use Path Project (CIP Project No. 538)

2 Documents in Project

Summary

SCH Number
2018112012
Lead Agency
Half Moon Bay, City of (City of Half Moon Bay)
Document Title
Highway 1/ Terrace Avenue Signalization and Eastside Multi-use Path Project (CIP Project No. 538)
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes: A new class I multi-use path on the east side of Hwy 1 between N. Main Street and Sprindrift Way; new 4-way traffic signal at Terrace Avenue; westside Frontage Rd will be extended southward to terrace Ave; hwy 1 northbound will be widened from two to four lanes, from Silver Avenue to 600 feet orth of Terrace Ave; new dedicated receiving lane on Southbound Hwy 1 for traffic turning left from Grandview Blvd; existing intersection of Hwy 1 and Grandview Blvd will be eliminated; Beleville Blvd will be restricted to a right in - right out "T" intersection; and highway median and strips adjacent to multi-use path will be landscaped.

Contact Information
Douglas Garrison
City of Half Moon Bay
501 Main Street
Half Moon Bay, CA 94019

650-712-5836

Location

Coordinates
37°28'20"N 122°26'7"W
Cities
Half Moon Bay
Counties
San Mateo
Cross Streets
Hwy 1/N Main St.; Spindrift Way; Grand Blvd.; Terrace Ave.; Frontage Road
Zip
94019
Total Acres
15.5
State Highways
1
Schools
Half Moon Bay HS
Waterways
Kehoe Slough
Township
5S
Range
5W
Section
Unsec
Base
Diablo

Notice of Determination

Approving Agency
City of Half Moon Bay
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
501 Main Street, Half Moon Bay, CA 94019

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search