Folsom Boulevard Complete Streets

3 Documents in Project

Summary

SCH Number
2018112004
Lead Agency
Sacramento County
Document Title
Folsom Boulevard Complete Streets
Document Type
NOD - Notice of Determination
Received
Posted
2/6/2019
Present Land Use
RD-20, RD-5, LC, TC, MP, Special planning area
Document Description
This project includes the installation of approx 4,750 lf of pedestrian and bicyclist infrastructure, along a portion of Folsom Blvd between Mayhew Rd and Bradshaw Rd. The work also includes; the installation of ramps that meet ADA requirements, pedestrian push button signals, installation of: storm drain inlets, curbs and gutters, bike lanes, landscaping buffer and safety fencing would occur along the south side of Folsom Blvd, restriping of lane lines, relocation of 15 utility poles. In order to install the pedestrian improvements, existing pavement and soil will be graded down no deeper than 18 inches to make room for base material and concrete overlay. Sidewalk construction will include the installation of curbs and gutters, as well as drainage inlets to connect new gutters to the existing storm water infrastructure. Installation of storm drain inlets could require removal of soil up to ten ft in depth. Some tree removal will be necessary to implement the proposed project. Sacramento County will be acquiring Public Utility Public Facilities Easements in order to implement proposed project improvements and relocate the utility poles.

Contact Information

Name
Jose Oseguera
Agency Name
CA Transportation Commission
Contact Types
Lead/Public Agency

Location

Cities
Rancho Cordova
Counties
Sacramento
Cross Streets
Folsom Blvd/Mayhew Road/Bradshaw Rd
Zip
95827
Total Acres
12
State Highways
50
Railways
UPRR
Airports
Mather AFB
Schools
Capitol Christian
Waterways
American River
Township
6E
Range
8,5
Section
8N
Base
MD

Notice of Determination

Approving Agency
CA Transportation Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.