Caldwell Interchange Project

4 Documents in Project

Summary

SCH Number
2018111056
Lead Agency
California Department of Transportation, District 6 (DOT)
Document Title
Caldwell Interchange Project
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2023
Document Description
Construct two 192-foot diameter roundabouts at the southbound ramp and northbound ramp intersections. The existing northbound loop on-ramp would be eliminated, and a new northbound slip on-ramp would be constructed. The profile of the existing Avenue 280 overcrossing structure would also be raised to correct non-standard vertical clearance and would be widened with a new structure. The Mid-Valley overhead structure would also be replaced. Caldwell Avenue would be widened to 4-lane configuration at the vicinity of the roundabouts, in Tulare County.

Contact Information

Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Assistant Deputy Director
Contact Types
Responsible Agency

Location

Counties
Tulare
Regions
Unincorporated
State Highways
State Route 99
Other Location Info
State Route (SR) 99 postmile 35.8 to postmile 37.1, in Tulare County.

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
District 6, 2015 East Shields Avenue Suite 100, Fresno, CA 93726

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print