State Route (SR-) 91 Improvement Project Between SR-57 and SR-55 (Streambed Alteration Agreement No. EPIMS-ORA-14861-R5)
7 Documents in Project
Summary
SCH Number
2018111042
Lead Agency
California Department of Transportation, District 12
(DOT)
Document Title
State Route (SR-) 91 Improvement Project Between SR-57 and SR-55 (Streambed Alteration Agreement No. EPIMS-ORA-14861-R5)
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2021
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement number EPIMS-ORA-14861-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, California Department of Transportation as represented by Brian Santos. The project is limited to geotechnical exploratory work to obtain information needed to further design the proposed widening of the eastbound side of the State Route 91 (SR-91) bridge over the Santa Ana River as part of the proposed SR-91 Improvements Project Between State Route 57 and State Route 55. The project will consist of drilling 11 geotechnical borings within the Santa Ana River streambed limits.
Contact Information
Name
Kathleen Dove
Agency Name
CalTrans, District 12
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Santa Ana
Counties
Orange
Regions
Southern California
Cross Streets
Eastbound side of the State Route 91 (SR-91) bridge over the Santa Ana River
Other Location Info
The project is limited to geotechnical exploratory work to obtain information needed to further design the proposed widening of the eastbound side of the State Route 91 (SR-91) bridge over the Santa Ana River as part of the proposed SR-91 Improvements Project Between State Route 57 and State Route 55. The project will consist of drilling 11 geotechnical borings within the Santa Ana River streambed limits.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
Project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.