University Drive Widening Improvements - Ridgeline Drive to I-405 Project

2 Documents in Project

Summary

SCH Number
2018111021
Lead Agency
Irvine, City of (City of Irvine)
Document Title
University Drive Widening Improvements - Ridgeline Drive to I-405 Project
Document Type
NOD - Notice of Determination
Received
Posted
7/26/2019
Project Applicant
City of Irvine

Document Description
The City proposes to widen University Dr from 2 to 3 through lanes in the eastbound direction from approximately 650 feet east of the intersection of Ridgeline Or/University Dr to the southbound 1~405 on,.ramp, The project will join the existing 3 through lanes at the easterly limits and will join the planned improvements at the westerly limits from the Ridgeline Intersection improvement Project. The proposed project includes restriping from the Ridgeline Or/University Dr intersection to the southbound I-405 on-ramp. The proposed configuration of University Dr would also include, an on-street Class II bike lane in the project area. The project also includes paving, grading, drainage, and landscaping.

Contact Information
Melissa Dugan
City of Irvine
One Civic Center Plaza, P.O. Box 19575
Irvine, CA 92606

Phone : (949) 724-7384

Location

Cities
Irvine
Counties
Orange
Cross Streets
University Dr from Rldgeline Dr to I-405 (Irvine, CA; County of Orange)

Notice of Determination

Approving Agency
City of Irvine
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of lrvine, Transportation Department (1 Civic Center Plaza, lrvine, CA 92606)

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2018111021   PDF 604 K
Download CSV New Search