Big Bear Lake Fish Hatchery
2 Documents in Project
Summary
SCH Number
2018111020
Lead Agency
Big Bear Municipal Water District
Document Title
Big Bear Lake Fish Hatchery
Document Type
NOD - Notice of Determination
Received
Posted
1/2/2019
Present Land Use
various: lake: floodway; Big Bear Marina: PF
Document Description
The District proposes to construct a fish hatchery on 1.25 acres of District-owned property adjacent to its District office and horizontally bore 3,600 ft of new water service line under the exposed lakebed of Big Bear Lake to service the hatchery. The hatchery will grow approx 157,000 lbs per year of fish for the District to stock Big Bear Lake to reduce the reliance on purchased fish from private and State hatcheries. All trout will be from sterilized triploid eggs to prevent breeding with native species down-stream and eliminate spawning of stocked fish. Operations will in an up to 100-ft by 150-ft insulated building located adjacent to the District's office. The facility will include a recirculated aquaculture system pump and treatment area, infiltration pump and treatment area, incubator room, locker room, employee areas.
Contact Information
Name
Mike Stephenson
Agency Name
Big Bear Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Big Bear Lake
Counties
San Bernardino
Cross Streets
Lakeview Drive
Zip
92315
Total Acres
1.5
Parcel #
various
State Highways
SR 38; SR 18
Schools
Various
Waterways
Big Bear Lake and all tributaries
Township
1S
Range
2W
Section
21
Base
SBBM
Notice of Determination
Approving Agency
Big Bear Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.