cont., Load (TMDL) for shellfish harvesting (shel) in Newport Bay; revise she; beneficial use definition; add antidegradation targets for non-contact water rec

1 Documents in Project

Summary

SCH Number
2018109011
Lead Agency
Regional Water Quality Control Board, Region 8 (Santa Ana), Riverside
Document Title
cont., Load (TMDL) for shellfish harvesting (shel) in Newport Bay; revise she; beneficial use definition; add antidegradation targets for non-contact water rec
Document Type
NOD - Notice of Determination
Received
Posted
10/24/2018
Document Description
On June 16, 2017, the Santa Ana Regional Water Quality Board adopted Resolution No. R8-2017-0019, approving amendments to the santa Ana Water Board's Basin Plan. The amendments revise the compliance schedule for the fecal Coliform Total Maximum Daily Load for shellfish harvesting in Newport Bay to extend the deadline to December 31, 2022 to implement measures to meet the SHEL objective; revise the SHEL beneficial use definition to make the definition consistent with the other coastal waterboards; add antidegradation targets for waters with non-contact water recreation beneficial use; add surface water bodies to Tables 3-1 and 4-1 and designate beneficial uses for those and other waters; and make other editorial changes.

Contact Information

Name
Claudio Tenorio
Agency Name
Regional Water Quality Control Board, Region 8 (Santa Ana), Rive
Contact Types
Lead/Public Agency

Location

Counties
Orange
Waterways
Newport Bay and Santa River River Watershed

Notice of Determination

Approving Agency
Santa Ana Water Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print