cont., Load (TMDL) for shellfish harvesting (shel) in Newport Bay; revise she; beneficial use definition; add antidegradation targets for non-contact water rec

1 Documents in Project

Summary

SCH Number
2018109011
Lead Agency
Regional Water Quality Control Board, Region 8 (Santa Ana), Riverside
Document Title
cont., Load (TMDL) for shellfish harvesting (shel) in Newport Bay; revise she; beneficial use definition; add antidegradation targets for non-contact water rec
Document Type
NOD - Notice of Determination
Received

Document Description
On June 16, 2017, the Santa Ana Regional Water Quality Board adopted Resolution No. R8-2017-0019, approving amendments to the santa Ana Water Board's Basin Plan. The amendments revise the compliance schedule for the fecal Coliform Total Maximum Daily Load for shellfish harvesting in Newport Bay to extend the deadline to December 31, 2022 to implement measures to meet the SHEL objective; revise the SHEL beneficial use definition to make the definition consistent with the other coastal waterboards; add antidegradation targets for waters with non-contact water recreation beneficial use; add surface water bodies to Tables 3-1 and 4-1 and designate beneficial uses for those and other waters; and make other editorial changes.

Contact Information
Claudio Tenorio
Regional Water Quality Control Board, Region 8 (Santa Ana), Rive
3737 Main Street, Suite 500
Riverside, CA 92501

951-782-4963

Location

Counties
Orange
Waterways
Newport Bay and Santa River River Watershed

Notice of Determination

Approving Agency
Santa Ana Water Board
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search