Streambed Alteration Agreement No. 1600-208-0288-R2 "Tama" THP

Summary

SCH Number
2018109006
Lead Agency
Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
Document Title
Streambed Alteration Agreement No. 1600-208-0288-R2 "Tama" THP
Document Type
NOD - Notice of Determination
Received
Posted
10/15/2018

Document Description
The project is limited to: water drafting from twelve locations (MP6, MP14, MP 40, MP41, MP51, MP61, MP 70, MP73, MP74, MP76, MP77); installing twenty-five low water crossings (MP4, MP5, MP10, MP11, MP12, MP13, MP13, MP15, MP21, MP23, MP24, MP27, MP31, MP34, MP35, MP39, MP42, MP46, MP49, MP53, MP56, MP57, MP62, MP63, MP66, MP72); Installing nine temporary corrugated metal piepes (MP2, MP3, MP29, MP30, MP44, MP47, MP48, MP60, and MP69); constructing one temporary bridge (MP25); cleaning the inlet and or outlet of six culverts with heavy equipment (MP9, MP26, MP28, MP45, MP50, MP71); and deactivating two corssings (MP38 and MP59). Further information can be found in the THP 2-18-046-PLU.

Contact Information
Steven Cordes
CDFW, North Central Region
1701 Nimbus Rd, Suite A
Rancho Cordova, CA 95670

Phone : (916) 358-2925

Location

Counties
Plumas
Waterways
Fall River, Dejonah Creek, Post Creek, South Branch of Middle Fork Feather River, Lake Oroville
Township
21N
Range
8E
Base
MDB&M
Other Information
Section 2, 3, 4; T22N, R8E, Section 16, 17, 22 ,23, 26-30; American House, Cascade, Dogwood Peak

Notice of Determination

Approving Agency
CDFW
Approved On
Final Environmental Document Available at
1701 Nimbus Road, Suite A, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.