Special Repair/Deferred Maintenance (Allocation #3, FY 18/19)
Summary
SCH Number
2018108360
Public Agency
California Department of Corrections and Rehabilitation
(CDCR)
Document Title
Special Repair/Deferred Maintenance (Allocation #3, FY 18/19)
Document Type
NOE - Notice of Exemption
Received
Posted
10/15/2018
Document Description
Repair and maintenance projects will be conducted at various CDCR prison facilities statewide as shown on the attached list. Projects involve a wide array of repairs; some examples are roof replacements, Wildlife Mitigation netting installation, boiler replacement, Flood Control Study, Brine Pond closure and reconstruction, replace chiller control panels, and WWTP Upgrades. These projects are necessary to maintain the buildings and infrastructure and to meet code requirements at CDCR prison facilities statewide and to ensure unimpeded operation and their public safety mission.
All work will be performed within the already developed prison property. The projects are not located within environmentally sensitive areas, and none of the exceptions to this exemption are applicable.
Contact Information
Name
Peter J Connelly, Jr.
Agency Name
California Department of Corrections and Rehabilitation
Contact Types
Lead/Public Agency
Phone
Location
Regions
Statewide
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
This exemption allows for the operation, repair, maintenance, permitting, leasing, licensing or minor alteration of existing public structures, facilities, or mechanical equipment to meet current standards of public health and safety, that involve negligible or no expansion of use beyond that existing at the time of the lead agency's determination. These projects consist of minor alterations to existing structures and equipment and involve no expansion of use. This is one of a class of projects that the Secretary of Resources has found do not have a significant effect on the environment, and therefore is declared to be categorically exempt from the requirement for preparing an environmental document.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.