New Cement Hill Pipeline Project
Summary
SCH Number
2018102023
Lead Agency
Suisun-Solano Water Authority
(SSWA)
Document Title
New Cement Hill Pipeline Project
Document Type
MND - Mitigated Negative Declaration
Received
Document Description
SSWA proposes to construct and operate the New Cement Hill Pipeline which would provide a second pipeline from the Cement Hill Water Treatment Plant to two 2-M gallon water storage tanks on Cement Hill. The construction of the mostly underground 20-in PVC pipeline would predominantly be open-cut construction in an approx 4-ft wide by 5.5 ft deep trench. After pipeline placement, the ground surface would be regraded and restored/repaved to original conditions. Construction of the pipeline is anticipated to begin in spring of 2019 and would take 85-105 calendar days.
Contact Information
Name
Jim Daniels
Agency Name
Suisun-Solano Water Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fairfield
Counties
Solano
Cross Streets
Moosup Court and Clay Bank Rd
Zip
94533
Total Acres
3.1
Parcel #
167-180-23, 25, 26, -190-28, 29
Railways
Amtrak Capitol Corridor
Waterways
Putah South Canal
Township
5N
Range
1W
Section
7,8
Base
MDBM
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Native American Heritage Commission (NAHC), California State Lands Commission (SLC), Delta Protection Commission, Delta Stewardship Council, Department of Water Resources, Resources Agency, Resources, Recycling and Recovery, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Other (water pipeline)
Local Actions
project approval
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.