Wilmer Road Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2018102018
Lead Agency
Regional Water Quality Control Board, Region 5 (Central Valley)
Document Title
Wilmer Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/18/2019
Project Applicant
San Joaquin County Department of Public Works

Document Description
The Project consists of replacing the existing 58 -foot -long bridge with a new single -span bridge that meets safety standards by providing improved roadway geometrics. Approximately 120 cubic yards of clean gravel will be temporarily placed within the channel to form a stream diversion. Clearing and grubbing will be completed within the work area. Replacement bridge foundations will be supported by cast-in-drilled hole piles. Falsework will be erected on temporary steel and timber supports within the channel before installing the concrete bridge and reinforcements.

Contact Information
Nicholas White
Regional Water Quality Control Board
11020 Sun Center Drive #200
Rancho Cordova, CA 95670

Phone : (916) 464-4644

Location

Coordinates
33°46'47.4"N 116°27'37.2"W
Counties
San Joaquin
Other Location Info
38° 4' 57.4"N /120° 56' 8.6"W Wilmer Road over Indian Creek (San Joaquin)

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
San Joaquin County Department of Public Works Headquarters, 1810 E Hazelton Ave. Stockton, CA 95205

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2018102018_5B39CR00318_18dec2019_nod   PDF 89 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print