Permit No. 888-2: Feather River Bridge Scour Project

7 Documents in Project

Summary

SCH Number
2018102014
Lead Agency
Caltrans, District 3 - Marysville/Sacramento (California Department of Transportation, District 3)
Document Title
Permit No. 888-2: Feather River Bridge Scour Project
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2020
Project Applicant
California Department of Transportation (Caltrans)

Document Description
Approval of Permit No. 888-2, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To rehabilitate scour damaged piers 17 through 20 and 23 of an existing 2,674-ft, 24-span, steel plate girder bridge (Caltrans Bridge No. 18-0009) on cellular concrete piers with spread footings. Piers to be retrofitted by driving ten (10) 48-inch diameter Cast-In-Steel-Shell (CISS) piles to a depth of approximately 70 to 150-feet surrounding the existing piers. The new reinforced concrete CISS piles will be encased in a new 63-foot by 41.5-foot reinforced concrete pile cap. Rock slope protection (RSP) to be placed along pier 23 on both ends after the retrofit. Existing RSP between piers 13 to 17 and along the east bank placed under previous emergency projects will be removed.

Contact Information
Jennifer Stewart
Central Valley Flood Protection Board
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821

Phone : (916) 574-1719
jennifer.stewart@cvflood.ca.gov

Location

Counties
Yuba
Other Location Info
The project is located on the State Highway 20 bridge connecting Yuba City and Marysville, in Yuba County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
This Mitigated Negative Declaration, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. CVFPB’s administrative record of proceedings related to the encroachment permit is available for public review at CVFPB’s office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
888-2_Caltrans Feather River Bridge Scour_NOD_signed   PDF 187 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print