Design Review 18-2323 to approve the Fuel Modification Zone 10-Barracuda and Fuel Modification Zone 11-Driftwood Fuel Modification Plan
2 Documents in Project
Summary
SCH Number
2018101072
Lead Agency
City of Laguna Beach
Document Title
Design Review 18-2323 to approve the Fuel Modification Zone 10-Barracuda and Fuel Modification Zone 11-Driftwood Fuel Modification Plan
Document Type
NOD - Notice of Determination
Received
Posted
12/24/2018
Present Land Use
Vacant/Zoning: R/HP, OSC-R1-RHP, MH-OSC, OSC-REC-RHP, OSC, R1, R3, OSC-R3-REC
GP: Residential/hillside protection, commercial/tourist corridor, industrial, OS-Res Hillside protection-village low density, OS-VMLD, OS-PRP-RHP, OS, POS, VLD, VHD, OS-PRP-VHD
Document Description
Conduct vegetation removal in FMZ 10 and FMZ as necessary to reduce fire hazards due to the growth of nonnative, fire-prone vegetation. The intent for fuel modification is to provide a defensible space adjacent to homes in an effort to enhance residents ability to evacuate and survive a severe fire event. All fuel modification activities would be conducted in accordance with the approved Treatment Protocols for Fuel Modification Zones Subject to Coastal Development Permitting (Treatment Protocol) prepared by the Laguna Beach Fire Dept.
Contact Information
Name
Evan Jeynak
Agency Name
City of Laguna Beach
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Laguna Beach
Counties
Orange
Cross Streets
FMZ10: Barracuda Wy/Balboa Ave FMZ11: Driftwood Dr/Ocean Vista Dr
Zip
92651
Total Acres
11.56
Parcel #
various
Township
7S
Range
8W
Section
30
Base
SB
Notice of Determination
Approving Agency
City of Laguna Beach
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.