Shaffer Elementary School - Source Capacity Study
Summary
SCH Number
2018098577
Public Agency
Shaffer Union Elementary School District
(SUESD)
Document Title
Shaffer Elementary School - Source Capacity Study
Document Type
NOE - Notice of Exemption
Received
Posted
9/26/2018
Document Description
Minor project involving development of an existing groundwater well on school grounds and associated piping to connect well to school water supply system. Abandonment of well #2 and construction of new sewerline to comply with drinking water system setback requirements. Well covered by SCH# 2016038232
Contact Information
Name
Jeff Baker
Agency Name
Shaffer Union Elementary School District
Contact Types
Lead/Public Agency
Phone
Location
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
Project is covered under CEQA Exemption Section 15301/15302 Class I/II for maintenance and rehabilitation of basic water and sewer infrastructure. Project entail minor trenching to construct water and sewer lines one school property that has been previously disturbed. No significant environmental impacts are anticipated with this minor maintenance/repair project.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.