San Andreas Sanitary District Collection Systems Improvements Project

5 Documents in Project

Summary

SCH Number
2018092063
Lead Agency
San Andreas Sanitary District
Document Title
San Andreas Sanitary District Collection Systems Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
5/5/2021
Document Description
Since the adoption of the Final IS/MND and approval of the proposed project, the District has discovered that portions of the existing sanitary sewer lines, which require removal and replacement for upsizing, were constructed with asbestos cement piping; the presence of asbestos in the aforementioned piping was unknown at the time the Final IS/MND was composed. No other project elements are to be changed or added. The District has reviewed and considered the information contained in this Addendum and finds that the updates to the project would not introduce new significant environmental effects, substantially increase the severity of previously identified environmental effects, or demonstrate that mitigation measures or alternatives previously found not to be feasible would in fact be feasible. The updates would not alter the findings of the Final IS/MND; therefore, no further environmental review is required beyond this Addendum to the Final IS/MND.

Contact Information

Name
Hugh Logan
Agency Name
District Manager
Contact Types
Lead/Public Agency

Location

Cities
San Andreas
Counties
Calaveras
Regions
Countywide
Other Location Info
San Andreas Sanitary District 675 Gold Oak Dr. San Andreas, CA 95249

Notice of Determination

Approving Agency
San Andreas Sanitary District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Calaveras
Final Environmental Document Available at
San Andreas Sanitary District 675 Gold Oak Dr. San Andreas, CA 95249

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print