San Andreas Sanitary District Collection System Improvements Project
5 Documents in Project
Summary
SCH Number
2018092063
Lead Agency
San Andreas Sanitary District
Document Title
San Andreas Sanitary District Collection System Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2018
Present Land Use
commercial, single family res, multi family res, recreation, two family res, and public service
Document Description
The project consists of the following: 1) Upsize sewer trunk segments adjacent to San Andreas Creek; 2) Improve maintenance hole geometry at MH E-1200; and 3) Upsize sewers with recurring maintenance issues tributary to the trunk improvements. Project construction is anticipated to take place between 2019-2021. It is anticipated that the project could be constructed between April and October of a single year, and would likely take between 3-6 months, limiting the timeframe of construction to the dry season and avoiding the risks associated with sewer bypassing during wet weather.
Contact Information
Name
Hugh Logan
Agency Name
San Andreas Sanitary District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Calaveras
Cross Streets
Treat Ave; California St; Main St; Pixley Ave; High School St; Gold Oak Rd
Zip
95249
Total Acres
~10
State Highways
49
Schools
Calaveras HS
Waterways
San Andrea Creek
Township
4N
Range
12E
Section
17/18/
Base
MD
Other Location Info
San Andreas
Notice of Determination
Approving Agency
San Andreas Sanitary District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.