Bay Area Ridge Trail - Fremont to Garin

Summary

SCH Number
2018092055
Lead Agency
East Bay Regional Parks District
Document Title
Bay Area Ridge Trail - Fremont to Garin
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Residential hillside, park, OS HL, OS HF
Document Description
The East Bay Regional Parks District proposes to construct and open approx 5 mi of the Ridge Trail between Vallejo Mill Historical Park and Garin Regional Park. The project would construct approx 3.9 mi of new non-motorized crossings (two new and five existing) would be provided for the proposed trail alignment, requiring hardening/modification and/or culvert upgrades, fords, or bridge construction. Most of the new trail alignment would be constructed using a SWECO Trail Dozer or similar small-scale trail construction equipment, as well as manual labor. Several retaining walls would also be constructed.

Contact Information

Name
Suzanne Wilson
Agency Name
East Bay Regional Parks District
Contact Types
Lead/Public Agency

Location

Cities
Fremont, Union City
Counties
Alameda
Cross Streets
Mission Blvd and Niles Canyon Rd
Zip
94536
Parcel #
85-5275-33-00, -36-0, -37-0, -42-0
State Highways
84, 238
Railways
Niles Canyon RR
Waterways
Alameda Crk
Township
4S
Range
1W
Section
9,10,1
Base
Niles

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, Cal Fire, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency, San Francisco Bay Conservation and Development Commission (BCDC), California Department of Transportation, District 4 (DOT), California Public Utilities Commission (CPUC)
State Reviewing Agency Comments
California Department of Transportation, District 4 (DOT), California Public Utilities Commission (CPUC)
Development Types
Recreational (segment of Bay Area Ridge Trail)
Local Actions
Other
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print