Jersey Island Pump Station Relocation Project

4 Documents in Project

Summary

SCH Number
2018092052
Lead Agency
Reclamation District No. 830
Document Title
Jersey Island Pump Station Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2019
Project Applicant
Reclamation District 830

Document Description
The Jersey Island Pump Station Relocation Project (Project) consists of the relocation and in-kind replacement of the existing pump station on Jersey Island. The pump station pumps water from the interior of the island to the San Joaquin River. The pump station will be relocated approximately 120 feet inland. Relocation of the pump will occur within the existing drainage ditch. The Project will tie into the existing pipes located through the levee, connecting the pump station to the existing pipes on the land-side of the slope.

Contact Information
Nicholas White
Regional Water Quality Control Board
11020 Sun Center Drive #200
Rancho Cordova, CA 95670

Phone : (916) 464-4856

Location

Coordinates
38°02'35.2"N 121°41'27.4"W
Counties
Contra Costa
Other Location Info
Jersey Island

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
This is to certify that the final EIR with comments and responses and record of project approval, or the negative Declaration, is available to the General Public at: MBK Engineers, 455 University Avenue, Suite 100, Sacramento, CA 95825

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2018092052   PDF 102 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print