California State Prison Solano Solar Project

3 Documents in Project

Summary

SCH Number
2018092047
Lead Agency
Department of General Services (DGS)
Document Title
California State Prison Solano Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
11/6/2018
Document Description
The proposed project is a solar PV power generation system to be located on approx +/- 58.2-acre of land at the address of 2100 Peabody Rd, Vacaville, CA 95696 which is part of the larger state-owned Solano State Prison facility. The ground-mount and carport solar arrays would convert sunlight to direct current electrical power which would then be converted to alternating current (AC) by string inverters before being delivered to the PG&E electrical system. The total system size is expected to be approx 5.0 megawatts (AC), subject to final design and site optimization. As discussed throughout this report, the proposed Project is planned to occupy vacant areas and existing parking lots which have been determined to be suitable for the planned solar PV arrays. The project has been designed to avoid impacts to jurisdictional water and other biological features identified during the environmental studied completed to date. The project site is completely within Solano State Prison property with no nearby neighbors other than residences on the east side of Peabody Road. Note: See NOD for full project description

Contact Information

Name
Terry Ash
Agency Name
Department of General Services
Contact Types
Lead/Public Agency

Location

Cities
Vacaville
Counties
Solano
Cross Streets
Peabody Rd
Zip
95696
Total Acres
58.2
Waterways
Putah Crk South, Alamo Crk

Notice of Determination

Approving Agency
DGS
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.