San Jose Water Company, Mireval Station Tank Replacement Project

2 Documents in Project

Summary

SCH Number
2018092024
Lead Agency
State Water Resources Control Board
Document Title
San Jose Water Company, Mireval Station Tank Replacement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The San Jose Water Company proposes to replace the existing 81,000 gallon Mireval Station water storage tank with two new glass-fused bolted steel tanks, sized 72,300 and 85,700 gallons. In addition, the project includes construction of approx 152 lf of a two to six-ft tall retaining wall on the southeast portion of the site.

Contact Information
Sara Paiva-Lowry
State Water Resources Control Board
850 Marina Bay Pkwy., Bldg. P
Richmond, CA 94804-6403

916-323-0626

Location

Coordinates
37°12'51.2"N 105°1'12.3"W
Cities
Los Gatos
Counties
Santa Clara
Cross Streets
16479 Blackberry Hill Rd
Zip
95030
Total Acres
0.19
Parcel #
532-26-012
State Highways
17, Santa Cruz Hwy
Schools
BHES, LVMES, RJFMS
Waterways
Lexington Reservoir, Vasona Reservoir
Township
8S
Range
1W
Section
22
Base
MD

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
State Water Board, Division of Drinking Water District Office

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search