Buck Avenue Bridge Replacement Project
4 Documents in Project
Summary
SCH Number
2018092002
Lead Agency
City of Vacaville
Document Title
Buck Avenue Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2019
Document Description
The Project would remove the existing Buck Avenue Bridge and the northerly and southerly pedestrian bridges over Alamo Creek and replace the three bridges with a single bridge of increased width that meets structural and hydraulic design standards. The new bridge would be a single-span, cast-in-place, pre-stressed concrete slab bridge that would accommodate 2 , 12-foot-wide travel lanes, 2, 8-foot-wide shoulders, and curb, gutter, and sidewalk. Utilities would be relocated to conform to the new bridge. Temporary construction easements or rights of entry would be required from four properties.
Contact Information
Name
Albert Enault
Agency Name
City of Vacaville
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
City of Vacaville
Contact Types
Project Applicant
Location
Cities
Vacaville
Counties
Solano
Cross Streets
Buck Avenue at Alamo Creek
Notice of Determination
Approving Agency
City of Vacaville
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.