Rose Hill Courts Redevelopment Project

7 Documents in Project

Summary

SCH Number
2018091035
Lead Agency
City of Los Angeles
Document Title
Rose Hill Courts Redevelopment Project
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2020
Document Description
The existing Rose Hill Courts public housing site is located on 5.24 acres and consists of 14 two-story, wood-frame buildings with townhouse and flat style apartments comprising 100 units and an administration building. The Rose Hill Courts Redevelopment Project ("Project") will demolish the existing 15 structures and construct a total of 185 residential housing units ( 183 affordable housing units onsite plus two market-rate managers' units). The Project includes 88 one-bedroom units, 59 two-bedroom units, 30 threebedroom units, and eight four-bedroom units; a 6,366-square-foot Management Office/Community Building; and a "Central park" green space, creating a park-like setting for residents. Accordingly, the Project includes ample open space and recreational amenities to promote continued community outdoor use such as outdoor communal space with shaded seating and grills, children's play areas with tot lots, paved surfaces, and several courtyards. The Project would provide a total of 174 parking spaces onsite, with at-grade and tuck-under parking; upgraded lighting, fencing, signage, and security features; and storm drain and utility improvements. The new sustainably designed buildings would be energy efficient and the landscaping would include waterefficient irrigation.

Contact Information

Name
Jenny Scanlion
Agency Name
Housing Authority of the City of Los Angeles
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Other Location Info
Identify street address and cross street or attach a map showing project site (preferably a USGS 15' or 7 ½' topographical map identified by quadrangle name): 4446 Florizel Street, within the Northeast Community Plan Area, in the EI Sereno Community of the City of Los Angeles, bounded by Florizel Street to the north, McKenzie A venue to the east, Mercury A venue to the south, and Boundary A venue to the west

Notice of Determination

Approving Agency
City of Los Angeles
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print