Goodman Commerce Center Long Beach – Building 1 (App. No. 2305-04, PECC-04-22) (Globemaster Corridor Specific Plan Program Environmental Impact Report/Environme

12 Documents in Project

Summary

SCH Number
2018091021
Lead Agency
City of Long Beach
Document Title
Goodman Commerce Center Long Beach – Building 1 (App. No. 2305-04, PECC-04-22) (Globemaster Corridor Specific Plan Program Environmental Impact Report/Environme
Document Type
NOD - Notice of Determination
Received
Posted
6/16/2023
Document Description
The proposed project includes demolition of the existing 450,000-sq. ft. aerospace manufacturing building and associated ancillary structures on the site, The developer will then construct a new tilt-up concrete warehousing/logistics/manufacturing industrial building, Building 1 (505,043 sq. ft.) on a 23.91-acre site. The new industrial building is proposed to be used for warehousing/logistics uses or manufacturing uses. The site will have up to 1,012 parking stalls for the manufacturing option, or 506 for the warehousing/logistics option, with a total of 61 dock high truck doors and up to 89 trailer parking spaces. Significant off-site improvements required of the project will include sidewalk, parkway, and bike lane improvements on Wardlow Rd., as well as the buildout of the “complete street” cross-section specified for Wardlow Road in the GCSP. Additional off-site improvements would include connections to an existing 12-inch potable water line and 8-inch sewer main adjacent to the project site in East Wardlow Road.

Contact Information

Name
Scott Kinsey, AICP
Agency Name
City of Long Beach
Job Title
Planner
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Citywide
Cross Streets
Wardlow Road and Cherry Avenue
Zip
90807
Total Acres
23.91
Parcel #
7149-003-017, 7149-003-018, 7149-008-015, 7149-008-004, 7149-008-007
State Highways
I-405 and I-710
Airports
Long Beach Airport
Schools
multi
Waterways
multi

Notice of Determination

Approving Agency
City of Long Beach Site Plan Review Committee
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Department of Development Services, 411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802 and at: http://www.longbeach.gov/lbds/planning/environmental/reports/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Compliance with previously approved Program EIR (SCH No. 2018091021))
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print