Limekiln Creek Bridge Replacement

5 Documents in Project

Summary

SCH Number
2018091017
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
Limekiln Creek Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2024
Document Description
The project is located in Monterey County on State Route 1 near Lucia. The project includes replacing the existing concrete Limekiln Creek Bridge and constructing viaducts on State Route 1. The replacement bridge will be an approximately 900-foot-long, two-span cast-in-place post-tensioned box girder bridge with 12-foot lanes and 4-foot shoulders. There will be one pier and two abutments. The replacement bridge would begin at the existing southern abutment and follow the existing alignment as closely as feasible without needing excessive excavation in the landslide area north of the bridge. The bridge would be approximately 50 feet west of the existing alignment at the furthest point. The northern abutment would be shifted approximately 80 feet northwest. A temporary 200-foot-long retaining wall would be required along the new northern abutment.

Contact Information

Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Associate Deputy Director
Contact Types
Responsible Agency

Location

Counties
Monterey
Regions
Northern California
Other Location Info
State Route (SR) 1 from postmile (PM) 20.9 to PM 21.3, in Monterey County.

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Monterey
Final Environmental Document Available at
Caltrans District 5, 50 Higuera Street, San Luis Obispo, CA 93401

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.