Summit Canyon Bridge Installation and Trail Construction at Donner Memorial State Park
Summary
SCH Number
2018088424
Public Agency
California Department of Parks and Recreation
Document Title
Summit Canyon Bridge Installation and Trail Construction at Donner Memorial State Park
Document Type
NOE - Notice of Exemption
Received
Posted
8/22/2018
Document Description
Construct a new pedestrian/bike bridge and reroute a trail at the Summit Canyon property in Donner Memorial State Park to re-establish safe public access and to protect resources. Work will:
-excavate approximately 10ft and install two 7' long by 2' wide by 1' thick concrete abutment pads;
-construct a new 35' long by 5' wide fiberglass pedestrian/bike bridge;
-remove approximately twenty-four small diameter (6"-12" DBH) conifer trees for trail reroute; and
-construct a new 300' long by 30" wide pedestrian/bike single-track trail
Contact Information
Name
Silver Hartman
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency
Phone
Location
Counties
Nevada, Placer
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15303;15304
Reasons for Exemption
Project consists of construction and location of limited numbers of new small structures; and the minor public alterations in the condition of land and vegetation that does not involve removal of healthy, mature, scenic trees and is included as "trail construction or realignment".
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.