Electric Vehicle Charging Stations Installation

Summary

SCH Number
2018088307
Lead Agency
Parks and Recreation, Department of (California Department of Parks and Recreation)
Document Title
Electric Vehicle Charging Stations Installation
Document Type
NOE - Notice of Exemption
Received
Posted
8/16/2018

Document Description
Install electric vehicle charging stations at Henry W. Coe State Park and San Juan Bautista State Historic Park to provide charging capabilities for state park electric fleet vehicles. At Henry W. Coe State Park, a fully self-contained Electrical Vehicle Charging Station (EVCS) will be located in a gated area in front of the Tin Barn/Maintenance shop. At San Juan Bautista State Historic Park, work will: -Excavate a total of 24" deep x 18" wide x 50' long trenches to install new electrical conduit to accommodate electricity needs while utilizing the existing electrical load center; -Excavate a 24" long x 24" wide x 24" deep section of asphalt, install necessary conduit and pedestal; -Backfill with sand and compact and pour concrete to create an 18' wide x 9' long parking spot for electrical vehicles; and -Excavate three (3) 12" long x 12" wide x 24" deep holes to install three (3) bollards to protect the charging pedestal.

Contact Information
Jill Poudrette
California Department of Parks and Recreation Monterey District
2211 Garden Road P.O. Box 942896
Monterey, CA 93940

Phone : (831) 649-2980
jill.poudrette@parks.ca.gov

Location

Counties
Monterey

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 3&4; 15303; 15304
Reasons for Exemption
Project consists of construction and location of limited number of new, small facilities or structures and minor public alterations in the condition of land, and/or vegetation, which do not involve removal of healthy, mature, scenic trees.
Download CSV New Search