Borrego Palm Canyon Road Asphalt Replacement (ABDSP 201)

Summary

SCH Number
2018088065
Public Agency
California Department of Parks and Recreation
Document Title
Borrego Palm Canyon Road Asphalt Replacement (ABDSP 201)
Document Type
NOE - Notice of Exemption
Received
Posted
8/3/2018
Document Description
The project will replace the failing road surface asphalt in portions of Borrego Palm Canyon Campground. Phase 1 starts at the Kiosk and ends at the entrance road into the maintenance yard. Phase 2 starts at the entrance of the maintenance yard and ends at the "Y" split entering the campground upper loop. (Phase 3 will not take place at this time). The project consists of grinding approx 94,525 sf of the existing asphalt 2" to 4" deep. The ground asphalt will be fine graded and compacted for reuse as sub-base for the new asphalt. The grinding process will not exceed 1" in depth of ground disturbance beneath the existing asphalt. Possible tree roots encountered will be left in place to the extent possible.

Contact Information

Name
Terry Gerson
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Other Location Info
Anza-Borrego Desert State Park

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15304
Reasons for Exemption
Trail and road repairs and grading on land with a slope of less than 10%.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print