Ravenswood-Cooley Landing 115 kV Reconductoring Project (A. 17-12-010)

2 Documents in Project

Summary

SCH Number
2018082065
Lead Agency
Public Utilities Commission (California Public Utilities Commission)
Document Title
Ravenswood-Cooley Landing 115 kV Reconductoring Project (A. 17-12-010)
Document Type
NOD - Notice of Determination
Received

Document Description
Reconductoring the approximately 1.6-mile existing Ravenswood-Cooley Landing 115 kV power line. The Ravenswood-Cooley Landing Line is a double-circuit power line supported by nine lattice steel towers between Ravenswood Substation and Cooley Landing Substation In the cities of Menlo Park and East Palo Alto on the southeastern portion of the San Francisco Peninsula. The project will replace the existing conductors with new steel-supported aluminum conductors, modify existing lattice steel towers, add a new optical fiber ground wire to the system, and reinforce select tower footings.

Contact Information
Billie Blanchard
CPUC
300 Capitol Mall, 4th Floor, CEQA Unit
Sacramento, CA 95814

916.823.4799

Location

Cities
Menlo Park East Palo Alto
Counties
San Mateo

Notice of Determination

Approving Agency
Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
413 Ivy Dr., Menlo Park and East Palo Alto Library-2415 University Ave, East Palo Alto

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes