250 Mountain Home Road Stream Bank Repair and Stabilization Project

3 Documents in Project

Summary

SCH Number
2018082035
Lead Agency
Woodside, City of (City of Woodside)
Document Title
250 Mountain Home Road Stream Bank Repair and Stabilization Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project involves the repair of a stream bank landslide that occurred in Feb 2017 along the southern side of Bear Gulch Crk at the project site. The slide debris would be removed from the channel and the pre-slide toe of bank line would be restored. The slope would be recontoured and would have a max slope of 2:1 (horizontal to vertical). The project is designed to stabilize the creek bank with log rootwads, engineered log rootwad jams, 0.5 ton and larger anchor and ballast boulders, live willow brush layering, a tight line in the seep zone, and 100% biodegradable fabric-covered upper bank riparian planting area. The project involves removal of one 4-in bay tree and seven stumps. The project also involves implementing a dewatering and fish relocation plan along a 124-ft section of the creek prior to the start of project construction. The zoning district in which the parcel is located is RR (Rural Residential)

Contact Information
Sage Schaan
City of Woodside
2955 Woodside Road
Woodside, CA 94062

(650) 851-6796

Location

Coordinates
37°25'32.2"N 122°15'26.3"W
Cities
Woodside
Counties
San Mateo
Cross Streets
250 Mountain Home Rd
Zip
94062
Parcel #
072-191-170
State Highways
84, I-280
Schools
Woodside ES
Waterways
Bear Gulch Crk, Dry Crk, West Union Crk, Redwood
Township
6S
Range
4W
Section
12
Base
MD

Notice of Determination

Approving Agency
Town of Woodside
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
2955 Woodside Rd, Woodside, CA 94062

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes