Johns Manville Remedial Action Plan Amendment (Pittsburg Making Waves Academy Charter School Project)

4 Documents in Project

Summary

SCH Number
2018082032
Lead Agency
City of Pittsburg
Document Title
Johns Manville Remedial Action Plan Amendment (Pittsburg Making Waves Academy Charter School Project)
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2021
Document Description
The Department of Toxic Substances Control (DTSC) approved the Remedial Action Plan (RAP) Amendment for the Johns Manville Project Site. The RAP Amendment addressed the remediation of the Bermed Property within the Plant Parcel of the Johns Manville site. The purpose of this work is to remove impacted soil that is currently capped under the berm onsite. The proposed remediation includes the removal and remediation of the berm on the eastern portion of the Site. The berm currently contains asbestos and petroleum hydrocarbon material covered with two feet of clean soil. This berm was constructed in 2006 to implement the original RAP. As part of the RAP Amendment, approximately 64,600 cubic yards of impacted soil will be excavated from the berm and disposed of off-site. The RAP Amendment includes procedures for air monitoring and dust control measures to protect workers and offsite receptors.

Contact Information

Name
Isabella Roman
Agency Name
DTSC Project Manager
Contact Types
Responsible Agency

Location

Cities
Pittsburg
Counties
Contra Costa
Other Location Info
420 East 3rd Street

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
https://www.envirostor.dtsc.ca.gov/public/profile_report?global_id=07390022

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Environmental Impact Report Addendum)
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.