Winter Island Tidal Habitat Restoration Project

7 Documents in Project

Summary

SCH Number
2018082025
Lead Agency
California Department of Water Resources (DWR)
Document Title
Winter Island Tidal Habitat Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
1/10/2019
Present Land Use
OS/Miscellaneous
Document Description
The Winter Island Tidal Habitat Restoration Project is a tidal restoration project proposed by DWR located in Contra Costa County at the confluence of the Sacramento and San Joaquin Rivers. The project site is currently a muted tidal wetland that is blocked from tidal influence by water control structures and a levee system. The project would include the removal of the water control structures and excavation of an eastern channel to re-establish full tidal connections to the existing marsh and surrounding waterways and enhance aquatic and wetland habitat. The project is expected to benefit native special-status fish species and may provide habitat for special-status bird species.

Contact Information

Name
Dan Riordan
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Antioch
Counties
Contra Costa
Zip
94565
Total Acres
544.37
Parcel #
074-020-001
Railways
BNSF
Waterways
Sacramento River, Middle, Broad, & New York Slough
Township
3N
Range
1E
Section
34
Other Information
Winter Island

Notice of Determination

Approving Agency
California Department of Water Resources
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print