Permit No. 19387: River Walk Trail Extension Project

4 Documents in Project

Summary

SCH Number
2018082018
Lead Agency
City of West Sacramento
Document Title
Permit No. 19387: River Walk Trail Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2020
Document Description
Approval of Permit No. 19387, under California Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To construct approximately 2,650-feet of Class 1 pedestrian/bike trail along the crown of the Sacramento River levee and extend the existing River Walk Trail adjacent to the Sacramento River channel. Improvements include a 12-foot wide paved pedestrian/bike path with 1-foot shoulders, pedestrian scale lighting, access gate with bollards, and signage posts along the crown of the levee; a 12-foot wide concrete path with 1-foot shoulders adjacent to the river; and a 12-foot wide concrete ramp that connects the levee crown with the River Walk Trail.

Contact Information

Name
Jennifer Stewart
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Name
Agency Name
City of West Sacramento
Contact Types
Project Applicant

Location

Cities
West Sacramento
Counties
Yolo
Other Location Info
The project is located in the City of West Sacramento on Levee Road, between the Broadrick Boat Launching Facility and the I Street Bridge, on the right (west) bank levee of the Sacramento River.

Notice of Determination

Approving Agency
CVFPB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print