Phase 2 Yettem Water Supply Well and Transmission Mains

4 Documents in Project

Summary

SCH Number
2018081099
Lead Agency
Tulare County
Document Title
Phase 2 Yettem Water Supply Well and Transmission Mains
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2021
Document Description
A Mitigated Negative Declaration (MND) was prepared and a Notice of Determination (NOD) filed in December 2018 for the Phase 2 Yettem Water Supply Well and Transmission Mains Project. The project consists of the development of a new well in Yettem ("Yettem Well 3"), the interconnection (via anew, underground water pipeline) of that well with an existing well and water storage tank in Y ettem (''Y ettem Well 1 "), the installation of new water meters in Yettem, and the interconnection of the Yettem and Seville water systems. This current Project consists of only the following new components that were not part of the original project: Yettem storage tank site improvements and emergency standby generator; new water services and meters (approximately 26 connections) along the original interconnection pipeline, including on-site private lateral pipes to connect to existing homes; integration of the Yettem and Seville pump station sites using a Supervisory Control and Data Acquisition (SCADA) system; and Water fill station at Seville tank site.

Contact Information

Name
Hector Guerra
Agency Name
Tulare County Resource Management Agency
Job Title
Chief Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Yettem
Counties
Tulare
Regions
Unincorporated
Cross Streets
Along SR 201 between roads, 136-144, 153-154
State Highways
SR 201
Railways
SJVRR
Waterways
Button Ditch

Notice of Determination

Approving Agency
Tulare County Resource Management Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
Tulare County Resource Management Agency, 5961 S. Mooney Blvd., Visalia CA 93277

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum Negative Declaration)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.