Caruthers Park Stormwater and Urban Runoff Capture Project

2 Documents in Project

Summary

SCH Number
2018081089
Lead Agency
Bellflower, City of (City of Bellflower)
Document Title
Caruthers Park Stormwater and Urban Runoff Capture Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes the construction and operation of new infrastructure improvements to optimize the configuration of the stormwater capture unit (diversion, storage, and outflow) so that the runoff and water quality goals of the associated WMPs are met in a way that maximize the benefit pursuant to benchmarks of runoff treatment. The associated infrastructure improvements are proposed to include an underground storage reservoir, two diversion structures, two pre-treatment units, pump station, and conveyance pipelines.

Contact Information
Bernardo Iniguez
City of Bellflower
16600 Civic Center Drive
Bellflower, CA 90706

(562) 804-1424 x 2233

Location

Cities
Bellflower
Counties
Los Angeles
Cross Streets
10500 Flora Vista St
Zip
90706
Parcel #
7017-026-905
State Highways
91
Railways
Pacific Electric Railway
Schools
numerous
Waterways
San Gabriel River

Notice of Determination

Approving Agency
City of Bellflower
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
16600 Civic Center Dr., Bellflower, CA 90706

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search