Pier 400 Railyard Enhancement Project

2 Documents in Project

Summary

SCH Number
2018081086
Lead Agency
Los Angeles, Port of (Port of Los Angeles)
Document Title
Pier 400 Railyard Enhancement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project is the construction of five new rail storage tracks with 15-foot center-to-center spacing and a short rail bridge (approx. 400 feet long) across the water. At buildout, the project would allow for approximately 525,275 TEUs/year to be utilize these rails tracks rather than being transported via heavy-duty on road trucks to off-dock railyards that are between 11 and 27 miles away.

Contact Information
Tara Tisopulos
Los Angeles Harbor Department
425 S. Palos Verdes Street
San Pedro, CA 90733

(310) 732-7713

Location

Coordinates
33°44'31.5"N 118°14'38.45"W
Counties
Los Angeles
Cross Streets
Terminal Island/Navy Way
Zip
90731
Total Acres
2+
Parcel #
744042904
State Highways
SR 47
Railways
Alameda Corridor, UP
Schools
Port of LA HS
Waterways
West Basin of POLA
Other Location Info
San Pedro
Other Information
Pier 400

Notice of Determination

Approving Agency
Los Angeles Harbor Department
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
222 W. 6th Street, 9th Floor, San Pedro, CA 90733

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search