Big Bear Lake Department of Water and Power Pipeline Replacement Project

2 Documents in Project

Summary

SCH Number
2018081040
Lead Agency
Big Bear Lake, City of (City of Big Bear Lake)
Document Title
Big Bear Lake Department of Water and Power Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The DWP proposes to construct 12.29 mi of new pipeline to replace pipeline that is no longer efficient or effective, due to age or b/c it is undersized; installation of new pipeline to create loops and improve fire flow and water quality. Of the 12.29 miles of pipeline that will be installed, approx 2.41 mi of pipeline installed will be new alignments that will improve flow within DWP's service area. The proposed 2.41 mi of new pipeline will create loops in the system to provide better fire flow, increase system efficiency, and prevent stagnation of water at dead ends within DWP's potable water system, which will not increase demand of or production of potable water over the long term. The pipeline will be installed at 74 different locations within existing roadways, and will vary in size. The existing pipeline will not be removed, it will remain in place once the new pipeline is installed. Construction is anticipated to begin in late Spring 2019, and continue over a period of approximately four dry seasons (April to October)

Contact Information
Reggie Lamson
City of Big Bear Lake, Department of Water and Power
P.O. Box 1929
Big Bear Lake, CA 92315

(909) 866-5050, ext 201

Location

Coordinates
34.234000°'"N 116.962149°'"W
Cities
Big Bear Lake
Counties
San Bernardino
Zip
92315,etc
Total Acres
3
State Highways
38, 18
Airports
Big Bear City
Waterways
Big Bear Lake
Township
2N
Range
1E
Section
20
Base
SBBM
Other Location Info
Fawnskin
Other Information
34.227994, -116.837682

Notice of Determination

Approving Agency
City of Big Bear Lake DWP
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search