Big Bear Lake Department of Water and Power Pipeline Replacement Project

2 Documents in Project

Summary

SCH Number
2018081040
Lead Agency
City of Big Bear Lake
Document Title
Big Bear Lake Department of Water and Power Pipeline Replacement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
N/A -- within road ROW
Document Description
The DWP proposes to construct 12.29 mi of new pipeline to replace pipeline that is no longer efficient or effective, due to age or b/c it is undersized; installation of new pipeline to create loops and improve fire flow and water quality. Of the 12.29 miles of pipeline that will be installed, approx 2.41 mi of pipeline installed will be new alignments that will improve flow within DWP's service area. The proposed 2.41 mi of new pipeline will create loops in the system to provide better fire flow, increase system efficiency, and prevent stagnation of water at dead ends within DWP's potable water system, which will not increase demand of or production of potable water over the long term.

Contact Information

Name
Reggie Lamson
Agency Name
City of Big Bear Lake, Department of Water and Power
Contact Types
Lead/Public Agency

Location

Cities
Big Bear Lake
Counties
San Bernardino
Zip
92315,etc
Total Acres
3
State Highways
38, 18
Airports
Big Bear City
Waterways
Big Bear Lake
Township
2N
Range
1E
Section
20
Base
SBBM
Other Location Info
Fawnskin

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Caltrans, Division of Aeronautics, Department of Fish and Wildlife, Region 6, Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 13, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type pipeline-12.29mi)
Local Actions
pipeline installation
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print