Mission Boulevard Bridge Replace at Santa Ana River

3 Documents in Project

Summary

SCH Number
2018081028
Lead Agency
Riverside County
Document Title
Mission Boulevard Bridge Replace at Santa Ana River
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2018
Present Land Use
Riverside - GP: P, OS/Natural; Z: PF Jurupa Valley - GP: OS-W, VHDR, CR; Z: W-1, R-VC, C-1/C-P
Document Description
RCTD in cooperation with the cities of Riverside and Jurupa Valley, proposes to replace the existing Mission Blvd Bridge over the Santa Ana. The proposed project will accommodate two 12-ft lanes, two 14-ft lanes, two 8-ft shoulders and a 4-ft median. A 12-ft multipurpose trail with barrier separation from vehicular traffic will be located along the south side of the bridge in lieu of standard sidewalks on each side. The new bridge will be approx 88 ft wide and 1,100 ft long. The replacement bridge profile will be raised slightly to accommodate current standards for the roadway design. At mid-span, the profile will be approx 4-6 ft higher than the existing bridge.

Contact Information

Name
Frances Segovia
Agency Name
Riverside County Transportation Department
Contact Types
Lead/Public Agency

Location

Cities
Jurupa Valley, Riverside
Counties
Riverside
Cross Streets
Crestmore Rd
Zip
92501/9
Total Acres
35.94
Parcel #
179 300 001-004, 179 300 002, 011 015, 017-18; 179 130-004-005; 179 330 004, 006, 008; 181-220 0
State Highways
I-215, SR 60
Airports
Flabob Airport
Schools
Bryant, Ina Arbuckle, Magnolia, West Riverside ESS, Central, Mis
Waterways
Santa Ana River
Township
2S
Range
5W
Section
Unsect
Base
SBBM

Notice of Determination

Approving Agency
Riverside County
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.