Newport Bay Water Wheel

3 Documents in Project

Summary

SCH Number
2018081013
Lead Agency
City of Newport Beach
Document Title
Newport Bay Water Wheel
Document Type
NOD - Notice of Determination
Received
Posted
10/9/2018
Present Land Use
Open Space
Document Description
The project entails installing and operating a floating trash removal system (water wheel) secured to pilings within San Diego Creek. Landside improvements would include construction of an access road and disposal bin loading/unloading system. The Water Wheel would generate a portion of its own power from the flowing current of San Diego Creek which would be used to propel a conveyor belt to divert floating trash and place it into a disposal bin prior to the trash entering Newport Bay. The Water Wheel would be operated during dry-weather and before, during and after most storm events and is designed for an expected useful life of 20 years. The project would encompass approximately 0.67 acres.

Contact Information

Name
John Kappeler
Agency Name
City of Newport Beach
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
Jamboree Rd and Bayview Way
Zip
92660
Total Acres
0.67
State Highways
73 & 55
Airports
John Wayne Airport
Schools
Bay-Back Newport
Waterways
San Diego Creek/Upper Newport Bay

Notice of Determination

Approving Agency
City Newport Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.