Golden State Water Company - Apple Valley South (Company) - Kiowa Well, Tank, and Booster Station Project

2 Documents in Project

Summary

SCH Number
2018081008
Lead Agency
State Water Resources Control Board
Document Title
Golden State Water Company - Apple Valley South (Company) - Kiowa Well, Tank, and Booster Station Project
Document Type
NOD - Notice of Determination
Received
Posted
9/12/2018
Present Land Use
residential

Document Description
The proposed project is the construction of the Kiowa Plant, which would include the construction and operation of a new well, disinfection building, an aboveground covered steel storage tank, a pump station, a retention basin, internal waterlines connecting plant components, and a waterline connection from the pump station to a water main near the intersection of Kiowa Rd and Marmoset St. The proposed project would include approx 450 lf (70 lf in public ROW) of 12-in diameter piping to tie into the existing water delivery system in Kiowa Rd. The proposed project is replacing an existing well (Mohawk Well 3A) located approx 0.5-mi northeast of the project site, which is 67 years old.

Contact Information
Eric Zuniga
State Water Resources Control Board
464 W. 4th Street, Room 437
San Bernardino, CA 92401

Phone : (909) 383-4327

Location

Cities
Apple Valley
Counties
San Bernardino
Cross Streets
10553 Kiowa Rd to Tussing Ranch Rd
Zip
92308

Notice of Determination

Approving Agency
State Water Resources Control Board
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search